Sign In | Join Free | My spintoband.com
spintoband.com
Beijing Zulin Formwork & Scaffolding Co., Ltd.(1)
Beijing Zulin Formwork & Scaffolding Co., Ltd. ---Formwork and scaffolding solution
Home > Hydroelectric Dam Formwork >

Hydroelectric Dam Steel formwork for concrete , ZULIN formwork in construction

Beijing Zulin Formwork & Scaffolding Co., Ltd.(1)
Beijing Zulin Formwork & Scaffolding Co., Ltd.(1)
City: Beijing
Province/State: Beijing
Country/Region: China
Tel: 86-010-69407048
Contact Person:
Mr Andy Liang

Hydroelectric Dam Steel formwork for concrete , ZULIN formwork in construction

Brand Name : ZULIN
Model Number : Climbing Formwork; Ring-Lock Shoring
Certification : ISO9001-2008
Place of Origin : Beijing, China (Mainland)
MOQ : One 20ft container
Price : negotiate
Payment Terms : T/T L/C (bank transfer)
Supply Ability : 100sets/day
Delivery Time : after deposit 15-20 days
Packaging Details : in bulk ,pallet ,bundle or according the customer demand
Contact Now

Steel formwork for concrete , peri climbing formwork in construction


Descrition:

This project is located in qiaojia county on the right bank of jinsha river in yunnan province, belongs to the part of the hydropower station diversion tunnel structure, the site is on the right bank 5 # diversion tunnel entrance ramp segment 0 ~ 0 + 020.00 + 000.00), 4 # diversion tunnel import gradient in 0 ~ 0 + 000.00 + 030.00. 5 # diversion tunnel imports for single span structure, the gradual crown for ellipse line gradient curve, axis at the top to ground height from 28.23 m to 21 m along the quarter ellipse line gradient, range of 0 ~ 0 + 003.00 + 000.00 paragraph structure is horn type open structure, two side piers along the circular arc in the change;4 # diversion tunnel imports for the double hole single span structure, the gradual range 0 ~ 0 + 020.00 + 000.00 for the double hole structure, range of 0 ~ 0 + 030.00 + 020.00 for single span structure.Crown of gradient change linear along a straight line, the cross section at the top to the height of 22 m unchanged.


Specifications:


Climbing Formwork; Ring-Lock Shoring are applied in this project. The detail is below:



Product Tags:

building construction formwork

      

hydroelectric dam construction

      
China Customized Inflatable Bumper Ball Game Bubble Adult Grass CE supplier

Hydroelectric Dam Steel formwork for concrete , ZULIN formwork in construction Images

Inquiry Cart 0
Send your message to this supplier
 
From:
Enter your email please.
To: Beijing Zulin Formwork & Scaffolding Co., Ltd.(1)
Subject:
Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0